-
ARTEC Charter School (closed)
FY24 Amount:
Total Since 1990: $200,238.00
FY23 Use:
-
ARTEC-I Charter School (closed)
FY24 Amount: $ -
Total Since 1990: $31,278.00
FY23 Use:
-
Aberdeen
FY24 Amount: $124,117.86
Total Since 1990: $1,606,110.40
FY23 Use: Building exterior repair, gym HVAC upgrades, AC and heater repairs, fire alarm upgrades
-
Alturas International Academy
FY24 Amount:
Total Since 1990: $269,424.00
FY23 Use: Renovation of portion of building
-
Alturas Preparatory Academy, Inc.
FY24 Amount:
Total Since 1990: $65,001.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
American Falls Joint
FY24 Amount: $304,442.40
Total Since 1990: $3,124,107.65
FY23 Use: New roof, general repairs
-
American Heritage Charter School
FY24 Amount:
Total Since 1990: $270,242.00
FY23 Use: Physical plant maintenance, painting, doors, wall rebuild
-
Another Choice Virtual Charter School (closed)
FY24 Amount:
Total Since 1990: $301,460.00
FY23 Use:
-
Anser Charter School
FY24 Amount:
Total Since 1990: $426,416.05
FY23 Use: Routine maintenance
-
Arbon Elementary
FY24 Amount: $3,541.73
Total Since 1990: $43,389.57
FY23 Use: Paint gym, lighting upgrade, update safety mats, replace septic systems, replace water pump
-
Avery
FY24 Amount: $3,740.83
Total Since 1990: $66,234.64
FY23 Use: Painting, roofing, flooring updates
-
Basin
FY24 Amount: $61,619.88
Total Since 1990: $761,280.80
FY23 Use: Floor install/repair/maintenance, fire alarm repair & maintenance, HVAC repair, plumbing repair, electrical, bathroom
-
Bear Lake County
FY24 Amount: $239,865.49
Total Since 1990: $2,705,395.19
FY23 Use: Maintenance personnel, repairs, asbestos removal, carpet replacement, roof repairs, security systems, electrical upgrades
-
Bingham Academy Charter
FY24 Amount:
Total Since 1990: $69,010.00
FY23 Use: General maintenance, HVAC repairs, plumbing repairs
-
Blackfoot
FY24 Amount: $738,432.62
Total Since 1990: $8,239,436.44
FY23 Use: Repair to roof, remodel locker room
-
Blackfoot Charter Community Learning Ctr.
FY24 Amount:
Total Since 1990: $405,225.62
FY23 Use: General maintenance, HVAC repairs, new coolant for systems & plumbing repairs, carpet
-
Blaine County
FY24 Amount: $616,911.34
Total Since 1990: $6,096,734.34
FY23 Use: Interior paint, lighting upgrades, flooring, plumbing repairs, filtered drinking fountains, replace water heaters, HVAC repairs, gym repairs
-
Bliss Joint
FY24 Amount: $25,588.50
Total Since 1990: $343,870.66
FY23 Use: HVAC units, carpet, floor repair & upkeep, repairs to CTE student occupied modular, electrical repairs
-
Boise Independent
FY24 Amount: $4,224,674.33
Total Since 1990: $48,732,704.14
FY23 Use: HVAC update, paint, flooring replacement, light & ceiling grids replacement, roofing
-
Bonner County (former)
FY24 Amount: $ -
Total Since 1990: $1,891,107.41
FY23 Use:
-
Bonneville Joint
FY24 Amount: $2,524,686.14
Total Since 1990: $20,645,764.45
FY23 Use: Routine maintenance & repairs, roofing, bleacher replacement
-
Boundary County
FY24 Amount: $253,397.43
Total Since 1990: $3,053,724.31
FY23 Use: Ongoing projects, plumbing/bathroom remodel, roof, gym floors, LED upgrade, handrails in gym, drainage in gym & auditorium, supplies & maintenance
-
Bruneau-Grand View Joint
FY24 Amount: $51,786.85
Total Since 1990: $821,516.86
FY23 Use: Electronic doors, shot lock, retrofit lights, general maintenance
-
Buhl Joint
FY24 Amount: $241,139.68
Total Since 1990: $2,633,033.17
FY23 Use: Furnaces, carpet, painting, restroom repairs, floor scrubbers
-
Butte County
FY24 Amount: $75,723.94
Total Since 1990: $1,073,177.75
FY23 Use: Flooring, cafeteria tables, HVAC upgrades, roofing, gym floor maintenance, electrical upgrades
-
COSSA (Centerpoint Alt Sec Sch)
FY24 Amount:
Total Since 1990: $126,137.00
FY23 Use: Replacement of furnace/ HVAC
-
Caldwell
FY24 Amount: $1,005,456.30
Total Since 1990: $11,481,018.69
FY23 Use: Deferred maintenance and repairs of roof, bathrooms, & HVAC
-
Camas County
FY24 Amount: $33,436.90
Total Since 1990: $381,562.00
FY23 Use: Gym floor repairs, remodel music room, roofing, plumbing upgrades
-
Cambridge Joint
FY24 Amount: $27,470.44
Total Since 1990: $380,267.24
FY23 Use: Rekeying locks, heating replacement, water leak repair, pump repair
-
Cardinal Academy, Incorporated
FY24 Amount:
Total Since 1990: $6,554.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Cascade
FY24 Amount: $38,070.49
Total Since 1990: $594,567.91
FY23 Use: Automatic door locking system, gym floor refinishing, classroom flooring
-
Cassia County Joint
FY24 Amount: $1,058,138.01
Total Since 1990: $10,577,888.71
FY23 Use: Theater rigging repair, HVAC replacement & repair, roofing, floor repairs and replacement, paint
-
Castleford Joint
FY24 Amount: $59,811.29
Total Since 1990: $667,479.61
FY23 Use: Maintenance, salary & benefits, supplies, new carpet, new bleachers, new water softener, roof repairs, outside door repairs, plumbing repairs, minor repairs to windows
-
Challis Joint
FY24 Amount: $67,190.25
Total Since 1990: $951,944.20
FY23 Use: Salaries, benefits, supplies & materials, heat unit replacements, access control
-
Chief Tahgee Elementary Academy
FY24 Amount:
Total Since 1990: $77,577.00
FY23 Use: Deep cleaning & safety maintenance
-
Clark County Joint
FY24 Amount: $20,028.61
Total Since 1990: $367,833.95
FY23 Use: Repair walk in freezers, update locks, repair fire suppression, film for windows, remodel entry, lunch room, replace water heater
-
Coeur d' Alene
FY24 Amount: $1,800,030.65
Total Since 1990: $18,932,557.68
FY23 Use: HVAC, security entrances, equipment, interiors, & flooring
-
Coeur d' Alene Charter Academy
FY24 Amount:
Total Since 1990: $727,179.00
FY23 Use: Carpet, modular ramp replacement, door access controls
-
Compass Charter School
FY24 Amount:
Total Since 1990: $939,916.88
FY23 Use: Wall protection in hallways, toilet flush valves replacement, gym floor
-
Connor Academy (formerly Roosevelt Center)
FY24 Amount:
Total Since 1990: $474,682.00
FY23 Use: Kitchen area electrical, ventilation maintenance & office security maintenance
-
Cottonwood Joint
FY24 Amount: $86,395.25
Total Since 1990: $928,806.81
FY23 Use: Regular maintenance, floor refinishing for gyms, heating units installations, remodel, gym roof membrane & repairs
-
Council
FY24 Amount: $55,022.61
Total Since 1990: $630,069.15
FY23 Use: Replaced power pole, panel, receptacles, sinks & plumbing
-
Culdesac Joint
FY24 Amount: $20,512.72
Total Since 1990: $325,010.33
FY23 Use: Ongoing repairs and maintenance, walk-in refrigerator
-
Dietrich
FY24 Amount: $36,683.14
Total Since 1990: $439,616.58
FY23 Use: Light fixture/ballast repairs, remodel wood shop, floor & carpet upkeep, boiler maintenance, classroom upgrades, paint
-
Doral Academy of Idaho
FY24 Amount:
Total Since 1990: $55,131.00
FY23 Use: Nothing reported
-
Elevate Academy
FY24 Amount:
Total Since 1990: $146,198.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Elevate Academy: Nampa
FY24 Amount:
Total Since 1990: $31,283.00
FY23 Use: N/A
-
Elevate Academy: North
FY24 Amount:
Total Since 1990: $21,376.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Emmett Independent
FY24 Amount: $454,081.70
Total Since 1990: $5,206,946.56
FY23 Use: Modular classroom repairs, school access controls, heating/HVAC repairs, sewer, gym bleachers, flooring
-
Falcon Ridge Charter School
FY24 Amount:
Total Since 1990: $344,999.24
FY23 Use: Gym floor refinishing, resurface gym floors, touch up painting, HVAC maintenance, general maintenance & repair, fire & security alarm
-
FernWaters Public Charter School
FY24 Amount:
Total Since 1990: $23,264.00
FY23 Use: Heat pump repairs, sheetrock/drywall, insulation repairs
-
Filer
FY24 Amount: $290,910.47
Total Since 1990: $2,889,677.80
FY23 Use: Salaries, benefits, repairs to security systems, paint, windows, carpet, furnaces, AC, restrooms, plumbing, annual maintenance supplies
-
Firth
FY24 Amount: $167,394.08
Total Since 1990: $1,756,015.71
FY23 Use: HVAC, roof repairs, paint, carpet, flooring
-
Forge International School
FY24 Amount:
Total Since 1990: $121,621.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Forrest M. Bird Charter School
FY24 Amount:
Total Since 1990: $337,251.30
FY23 Use: General repairs & maintenance, bathroom stalls, heaters
-
Fremont County Joint
FY24 Amount: $436,023.05
Total Since 1990: $4,729,622.18
FY23 Use: Security Entrance, safety window film, flooring, access controls, lighting, gym shot clocks, sound system
-
Fruitland
FY24 Amount: $311,033.38
Total Since 1990: $3,149,794.95
FY23 Use: Salaries/benefits maintenance staff, yearly building maintenance repairs, new carpet, doors/locks
-
Future Public School, Inc
FY24 Amount:
Total Since 1990: $141,369.00
FY23 Use: Routine maintenance
-
Garden City Community School (Closed)
FY24 Amount:
Total Since 1990: $46,611.00
FY23 Use:
-
Garden Valley
FY24 Amount: $48,372.96
Total Since 1990: $572,483.79
FY23 Use: Repaint stage, upgrade lighting, remodel music room, flooring, leak repairs, HVAC repairs, re-key doors
-
Gem Prep - Nampa
FY24 Amount:
Total Since 1990: $206,211.00
FY23 Use: Summer maintenance & building repairs, hood installation
-
Gem Prep: Meridian
FY24 Amount:
Total Since 1990: $171,999.00
FY23 Use: Summer maintenance & building repairs & range hood installation
-
Gem Prep: Meridian North
FY24 Amount:
Total Since 1990: $59,878.00
FY23 Use: Summer Maintenance & building repairs
-
Gem Prep: Meridian South
FY24 Amount:
Total Since 1990: $19,470.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Gem Prep: Online
FY24 Amount:
Total Since 1990: $158,817.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Gem Prep: Pocatello
FY24 Amount:
Total Since 1990: $161,676.00
FY23 Use: Summer maintenance & building repairs
-
Gem Prep: Twin Falls
FY24 Amount: $ -
Total Since 1990: $ -
FY23 Use: New School, received no funding
-
Genesee Joint
FY24 Amount: $56,018.07
Total Since 1990: $646,305.16
FY23 Use: Lighting, windows replaced, electrical panel upgrade, boiler repairs & maintenance, painting, regular maintenance
-
Glenns Ferry Joint
FY24 Amount: $68,864.72
Total Since 1990: $1,003,490.31
FY23 Use: Fire suppression system, HVAC repair & installation
-
Gooding Joint
FY24 Amount: $230,399.21
Total Since 1990: $2,511,776.06
FY23 Use: Bleachers repair, painting, motor in mechanical room, HVAC repairs, partial roof replacement, heat exchanger replacement
-
Grace Joint
FY24 Amount: $99,220.94
Total Since 1990: $1,109,390.27
FY23 Use: Kitchen roof, gym roof, snow stops for roof, plumbing & electrical, classroom roof, misc. maintenance
-
Grangeville Joint (former)
FY24 Amount:
Total Since 1990: $1,154,684.88
FY23 Use:
-
Hagerman Joint
FY24 Amount: $64,985.57
Total Since 1990: $770,625.08
FY23 Use: General ongoing building maintenance, vaporizer for propane tank for building heating, heater replacement
-
Hansen
FY24 Amount: $58,541.30
Total Since 1990: $733,360.92
FY23 Use: Misc. repairs & supplies, repair heaters, new hot water heater, tile & carpet, bathroom updates, exterior doors replacement, walls in weight room
-
Hayden Canyon Charter School
FY24 Amount:
Total Since 1990: $110,391.00
FY23 Use: General maintenance, security camera installation, classroom maintenance/updates
-
Heritage Academy
FY24 Amount:
Total Since 1990: $139,243.00
FY23 Use: New boiler, walk in fridge/freezer, electrical repairs, plumbing repair
-
Heritage Community Charter
FY24 Amount:
Total Since 1990: $410,523.00
FY23 Use: Emergency shower install, HVAC services, interior painting, replace carpet, carpet & window cleaning, bathroom plumbing repairs, window repairs, window tinting, handyman services provided
-
Hidden Springs Charter School (closed)
FY24 Amount:
Total Since 1990: $115,934.37
FY23 Use:
-
Highland Joint
FY24 Amount: $34,231.17
Total Since 1990: $471,270.11
FY23 Use: Ongoing maintenance, vinyl flooring
-
Homedale Joint
FY24 Amount: $252,087.62
Total Since 1990: $2,489,177.08
FY23 Use: General maintenance, building repair, roof repair/replacement, floor covering, HVAC, paging/bell system, security cameras
-
Horseshoe Bend
FY24 Amount: $38,613.28
Total Since 1990: $560,359.37
FY23 Use: Finish remodel of locker room, new girls locker room, new HVAC
-
Idaho Arts Charter School
FY24 Amount:
Total Since 1990: $1,064,005.00
FY23 Use: Salaries & benefits, general repairs, door locks & alarm doors upgrades, glass treatments, AC repairs & window replacement
-
Idaho College & Career Readiness Academy
FY24 Amount:
Total Since 1990: $101,038.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Idaho Connects Online School
FY24 Amount:
Total Since 1990: $247,848.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Idaho Distance Education Academy (closed)
FY24 Amount:
Total Since 1990: $664,473.72
FY23 Use:
-
Idaho Falls
FY24 Amount: $1,905,999.74
Total Since 1990: $20,215,406.53
FY23 Use: Salaries& benefits, install controlled access to buildings, electrical upgrades, polished concrete, gym floor refinish/repair, carpet repair/replacement, repair ceilings, fire sprinkler repair/replacement, new camera systems
-
Idaho Leadership Academy (closed)
FY24 Amount:
Total Since 1990: $27,389.69
FY23 Use:
-
Idaho School for the Deaf and Blind
FY24 Amount: $21,426.44
Total Since 1990: $136,141.07
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Idaho Science & Technology Charter School
FY24 Amount:
Total Since 1990: $251,799.00
FY23 Use: No Report Submitted
-
Idaho Virtual Academy
FY24 Amount:
Total Since 1990: $2,788,360.73
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Inspire Virtual Charter School
FY24 Amount:
Total Since 1990: $996,920.34
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Island Park Charter School
FY24 Amount:
Total Since 1990: $4,430.00
FY23 Use: None
-
Jefferson County Joint
FY24 Amount: $1,214,529.66
Total Since 1990: $10,076,225.28
FY23 Use: Routine maintenance, HVAC repairs, boiler repairs, bell system repairs
-
Jerome Joint
FY24 Amount: $781,974.99
Total Since 1990: $7,025,834.91
FY23 Use: Regularly scheduled maintenance, carpet, tile, HVAC, irrigation pipe, gym floor
-
Kamiah Joint
FY24 Amount: $73,745.60
Total Since 1990: $1,034,616.28
FY23 Use: Salaries, & benefits, cameras, fire & CO protection, maintain facilities, HVAC services, back door set up, carpet
-
Kellogg Joint
FY24 Amount: $215,071.26
Total Since 1990: $2,623,600.93
FY23 Use: Modernized elevator, classroom unit heaters, lockers, HVAC servicing & boiler servicing
-
Kendrick Joint
FY24 Amount: $57,097.36
Total Since 1990: $624,833.08
FY23 Use: HVAC upgrades, fieldhouse bldg., roof replacement
-
Kimberly
FY24 Amount: $385,298.72
Total Since 1990: $3,188,951.56
FY23 Use: Salaries & benefits, supplies, contracted services, HVAC repair & replacement, family restroom, windows, water coolers installation, carpet in classrooms
-
Kootenai Bridge Academy Charter School
FY24 Amount:
Total Since 1990: $231,545.00
FY23 Use: Roofing maintenance, electrical repair, drinking fountain, misc. building safety updates/repairs
-
Kootenai Classical Academy
FY24 Amount: $ -
Total Since 1990: $ -
FY23 Use: New School, received no funding
-
Kootenai Joint
FY24 Amount: $40,885.02
Total Since 1990: $500,644.66
FY23 Use: Water heater, fire system testing, repair kit, repair plugged drain line, heating system, gym floor refinishing, painting, circuits in gym, boiler, replace heat pump
-
Kuna Joint
FY24 Amount: $1,127,711.08
Total Since 1990: $8,833,447.87
FY23 Use: Restrooms, Carpets, HVAC upgrade, ADA doors
-
Lake Pend Oreille
FY24 Amount: $761,355.40
Total Since 1990: $6,280,333.57
FY23 Use: HVAC upgrades, roofing, replacement of windows, doors, flooring
-
Lakeland
FY24 Amount: $884,685.27
Total Since 1990: $8,304,387.26
FY23 Use: Routine maintenance, repair/replace exterior siding, trim, windows & doors, replace bleachers
-
Lapwai
FY24 Amount: $94,639.74
Total Since 1990: $1,051,437.51
FY23 Use: Ongoing maintenance, HVAC & plumbing system, carpet
-
Legacy Charter School
FY24 Amount:
Total Since 1990: $244,542.00
FY23 Use: Normal repair & maintenance, computer room update, wall repair
-
Lewiston Independent
FY24 Amount: $883,719.15
Total Since 1990: $9,530,604.50
FY23 Use: Roofs, replace floor coverings, kitchen repairs/improvements, build/install cabinets
-
Liberty Charter School
FY24 Amount:
Total Since 1990: $566,249.51
FY23 Use: General plumbing, lighting, electrical, alarm systems, HVAC repair & replacement, resurface gym floor, floor replacement, touchless drinking fountains, partial salary of maintenance employee
-
MOSAIC
FY24 Amount:
Total Since 1990: $93,586.00
FY23 Use: Routine maintenance
-
Mackay Joint
FY24 Amount: $41,327.21
Total Since 1990: $504,403.50
FY23 Use: Annual inspections, refinish gym & stage floors, HVAC system, window replacement, lighting, water heater replacement, boiler repairs
-
Madison
FY24 Amount: $1,084,403.43
Total Since 1990: $9,679,958.19
FY23 Use: Boiler repairs, roof repairs, carpet
-
Marsh Valley Joint
FY24 Amount: $228,035.26
Total Since 1990: $2,711,966.18
FY23 Use: HVAC, dishwasher repairs
-
Marsing Joint
FY24 Amount: $158,491.54
Total Since 1990: $1,624,922.88
FY23 Use: Carpet, HVAC blower motors & element, gym floor
-
McCall-Donnelly Joint
FY24 Amount: $269,414.87
Total Since 1990: $2,302,029.79
FY23 Use: Water heater replacement, flooring replacement, glass/window replacement, HVAC maintenance, replace bleachers, painting
-
Meadows Valley
FY24 Amount: $24,261.92
Total Since 1990: $386,021.98
FY23 Use: Asbestos removal, replace old light fixtures
-
Melba Joint
FY24 Amount: $160,013.02
Total Since 1990: $1,558,234.17
FY23 Use: HVAC repairs & replacement, general maintenance, roof replacement
-
Meridian Charter High School
FY24 Amount:
Total Since 1990: $281,913.55
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Meridian Medical Arts Charter High School
FY24 Amount:
Total Since 1990: $263,770.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Middleton
FY24 Amount: $842,182.37
Total Since 1990: $6,433,614.77
FY23 Use: HVAC, plumbing, security/fire & lighting systems repairs & replacements, roof replaced
-
Midvale
FY24 Amount: $29,350.29
Total Since 1990: $295,075.71
FY23 Use: Electrical works in classrooms, thermostat replacements, new heating & cooling unit, water heater replacement, ag shop electric work, painting for classrooms, new carpet & tile for classrooms
-
Minidoka County Joint
FY24 Amount: $841,622.82
Total Since 1990: $8,707,241.12
FY23 Use: Lighting, door locks, HVAC repair, carpet replacement, maintenance/custodial supplies & salaries
-
Monticello Montessori School
FY24 Amount:
Total Since 1990: $178,241.00
FY23 Use: Plumbing repairs, electrical, HVAC, paint & general maintenance
-
Moscow
FY24 Amount: $411,134.51
Total Since 1990: $4,655,966.59
FY23 Use: Carpet replacement throughout all schools
-
Moscow Charter School
FY24 Amount:
Total Since 1990: $213,956.66
FY23 Use: Carpet cleaning, bathroom remodel, fire alarm upgrade, general maintenance
-
Mountain Community School
FY24 Amount:
Total Since 1990: $7,842.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Mountain Home
FY24 Amount: $718,881.84
Total Since 1990: $7,792,677.59
FY23 Use: HVAC upgrades, new paint, electrical upgrades, asbestos abatement, new tile, new carpet
-
Mountain View
FY24 Amount: $218,340.55
Total Since 1990: $1,660,490.55
FY23 Use: Fire alarm system & inspections, HVAC repairs & maintenance, supplies & materials for general upkeep, snake sewer lines, plumbing repairs, carpet tiles/floor coverings
-
Mullan
FY24 Amount: $15,814.16
Total Since 1990: $288,801.24
FY23 Use: Boiler repair, water main repair
-
Murtaugh Joint
FY24 Amount: $82,550.00
Total Since 1990: $643,452.24
FY23 Use: Gym floor resurface, HVAC, general maintenance
-
Nampa
FY24 Amount: $2,402,529.85
Total Since 1990: $24,991,924.41
FY23 Use: Roof projects, HVAC, flooring, cafeteria upgrade
-
Nampa Classical Academy Charter School (closed)
FY24 Amount:
Total Since 1990: $22,337.00
FY23 Use:
-
New Plymouth
FY24 Amount: $186,047.90
Total Since 1990: $1,912,689.64
FY23 Use: HVAC upgrade, locker replacements, maintenance, flooring, windows, lighting updates
-
Nezperce Joint
FY24 Amount: $33,499.77
Total Since 1990: $378,799.85
FY23 Use: Regular maintenance, carpet, flooring, cabinets in classrooms, doors, water bottle filler
-
North Gem
FY24 Amount: $24,725.07
Total Since 1990: $387,681.68
FY23 Use: New paint, drain lines for bathrooms, wall repairs, carpet cleaning & replacement, gym floor sealant, misc. maintenance
-
North Idaho Stem Charter School
FY24 Amount:
Total Since 1990: $379,333.00
FY23 Use: New carpet, repair wiring, regular maintenance, roofing repair, door lock repair
-
North Star Charter School
FY24 Amount:
Total Since 1990: $989,711.89
FY23 Use: Custodial contract, HVAC, sprinkler maintenance, electrical work
-
North Valley Academy
FY24 Amount:
Total Since 1990: $236,526.00
FY23 Use: Salaries & benefits, door knobs, interior painting, new blinds
-
Notus
FY24 Amount: $61,942.62
Total Since 1990: $746,686.37
FY23 Use: General maintenance, materials/supplies, services, HVAC, Alarm system
-
OWL Charter Academy (closed)
FY24 Amount:
Total Since 1990: $14,946.00
FY23 Use:
-
Odyssey Charter School (closed)
FY24 Amount:
Total Since 1990: $19,062.00
FY23 Use:
-
Oneida County
FY24 Amount: $181,074.81
Total Since 1990: $4,004,706.75
FY23 Use: New roofs, flooring replacement, updated restrooms, HVAC fixes & replacements
-
Orofino Joint
FY24 Amount: $239,982.85
Total Since 1990: $2,732,154.56
FY23 Use: Paint exterior, remodel classroom, new windows, roofing, new door & frame, handicap ramp and handrail, refinish gym floor
-
Palouse Prairie Charter School
FY24 Amount:
Total Since 1990: $164,188.00
FY23 Use: HVAC & fire system maintenance & repairs, roof venting
-
Parma
FY24 Amount: $202,427.90
Total Since 1990: $2,096,056.90
FY23 Use: Heater & AC repairs, floor refinishing, repairs per inspection reports, roof repairs, greenhouse kit, refinish gym foyer, remodel library to make 2 rooms
-
Pathways in Education - Nampa
FY24 Amount:
Total Since 1990: $116,249.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Payette Joint
FY24 Amount: $252,655.55
Total Since 1990: $3,182,921.77
FY23 Use: New furnaces, carpet, paint & general building maintenance
-
Payette River Technical Academy
FY24 Amount:
Total Since 1990: $181,885.00
FY23 Use: Electrical updates to classrooms, routine maintenance to floors and hardware
-
Peace Valley Charter, Inc.
FY24 Amount:
Total Since 1990: $132,516.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Pinecrest Academy of Idaho
FY24 Amount:
Total Since 1990: $55,131.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Pinecrest Academy of Lewiston
FY24 Amount: $ -
Total Since 1990: $ -
FY23 Use: New School, received no funding
-
Pleasant Valley Elementary
FY24 Amount: $2,495.98
Total Since 1990: $35,249.18
FY23 Use: Repairs to facilities
-
Plummer / Worley Joint
FY24 Amount: $62,531.51
Total Since 1990: $897,155.46
FY23 Use: Replace windows, HVAC service, repair walk in freezer, repair boiler, HVAC replacement and repair, misc. repairs as needed, LED lighting replacement, repair refrigerator, repair boiler
-
Pocatello
FY24 Amount: $2,287,086.10
Total Since 1990: $24,298,599.32
FY23 Use: Tile upgrade, bathroom remodel, lighting upgrade, secure entrance, carpet, general maintenance & repairs
-
Pocatello Community Charter School
FY24 Amount:
Total Since 1990: $402,187.00
FY23 Use: Rubber base to prevent flooding, bathrooms upgrade, classroom doors & window, routine maintenance
-
Post Falls
FY24 Amount: $1,136,695.35
Total Since 1990: $10,302,059.47
FY23 Use: Salaries for HVAC technician, electrician, carpenter to perform routing building maintenance, flooring, paint
-
Potlatch
FY24 Amount: $90,437.86
Total Since 1990: $1,040,167.98
FY23 Use: Flooring, doors
-
Prairie Elementary
FY24 Amount: $1,251.13
Total Since 1990: $18,604.61
FY23 Use: Gym floor refinishing, water system bulb replacement
-
Preston Joint
FY24 Amount: $485,812.70
Total Since 1990: $4,748,946.92
FY23 Use: Building classroom pods, HVAC repair & installation
-
Project Impact STEM Academy, Inc
FY24 Amount:
Total Since 1990: $94,806.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Promise Academy
FY24 Amount: $ -
Total Since 1990: $ -
FY23 Use: New School, received no funding
-
RISE Charter School, Inc.
FY24 Amount:
Total Since 1990: $25,290.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Richard McKenna Charter High School
FY24 Amount:
Total Since 1990: $507,721.61
FY23 Use: Maintenance salaries, materials & supplies to maintain building
-
Richfield
FY24 Amount: $41,061.06
Total Since 1990: $437,702.59
FY23 Use: Floor maintenance, fire alarm panels, replace thermostats, electrical wiring repair, boiler repair, heating motor repairs, FOB's for school entrance, repair to return air sensors, boiler water treatments
-
Ririe Joint
FY24 Amount: $139,102.12
Total Since 1990: $1,436,743.16
FY23 Use: New windows, greenhouse, general upkeep
-
Rockland
FY24 Amount: $35,287.40
Total Since 1990: $376,895.06
FY23 Use: General maintenance (plumbing, electrical, flooring, HVAC), salary & benefits, gym repairs
-
Rolling Hills Charter School
FY24 Amount:
Total Since 1990: $289,855.96
FY23 Use: Plumbing, HVAC, water heaters, fire extinguisher inspections, replace flooring, replace lighting, recondition gym floors
-
SEI Tec (closed)
FY24 Amount:
Total Since 1990: $120,906.00
FY23 Use:
-
Sage International School of Boise
FY24 Amount:
Total Since 1990: $735,458.00
FY23 Use: General, internal surfaces, fixtures, systems
-
Salmon
FY24 Amount: $126,351.88
Total Since 1990: $1,844,386.52
FY23 Use: Safety & door locks, new gym floor, carpet, furnaces, upgrade lighting to LED
-
Salmon River Joint
FY24 Amount: $27,581.51
Total Since 1990: $213,091.51
FY23 Use: Replace gym floor, bleachers, water heater, heater/cooler, etc.
-
Shelley Joint
FY24 Amount: $500,493.09
Total Since 1990: $4,478,320.73
FY23 Use: Salaries, benefits, fire alarm services and repair, HVAC repair and upgrades, plumbing repairs, electrical & boiler upgrades & repairs, carpet, general maintenance & repairs
-
Shoshone Joint
FY24 Amount: $99,560.44
Total Since 1990: $1,039,525.06
FY23 Use: Carpet, paint for classrooms/halls, tile bathroom wall, sand gym floor, electrical & plumbing for water fountains, replace windows, repair intercom system, air/heat repairs
-
Snake River
FY24 Amount: $358,356.39
Total Since 1990: $4,107,739.62
FY23 Use: Refinish/paint gym floor, electrial lighting replacement, carpeting, water testing/repairs, painting, plumbing
-
Soda Springs Joint
FY24 Amount: $171,396.86
Total Since 1990: $1,946,572.57
FY23 Use: Roof repair, cafeteria floor, boiler maintenance, new boiler, installing a man trap, heating, plumbing, electrical, maintenance projects
-
South Lemhi
FY24 Amount: $24,639.15
Total Since 1990: $279,224.30
FY23 Use: Water samples, gym pipe repair, replace bleachers, replace broken windows
-
St. Maries Joint
FY24 Amount: $176,942.08
Total Since 1990: $2,185,425.98
FY23 Use: HVAC installation and upgrades, floor replacements and refinishing, electrical repairs, roof repair and replacement
-
Sugar-Salem Joint
FY24 Amount: $313,435.05
Total Since 1990: $3,053,812.20
FY23 Use: Carpet, library shelves, boiler repairs, sprinkler system repairs, general maintenance & repairs
-
Swan Valley Elementary
FY24 Amount: $9,975.54
Total Since 1990: $139,320.74
FY23 Use: Carpet cleaning, gym floor resurfacing with volleyball pole inserts, air duct repairs & upgrades, new fire alarm system
-
Syringa Mountain School
FY24 Amount:
Total Since 1990: $77,945.00
FY23 Use: General maintenance, elevator repairs
-
Tammany Elementry (former)
FY24 Amount:
Total Since 1990: $57,646.75
FY23 Use:
-
Taylor's Crossing Charter School
FY24 Amount:
Total Since 1990: $436,255.00
FY23 Use: HVAC, gym floor refinishing, carpet cleaning, plumbing repairs, heat roof tape installation & electrical, gutters installation, new drinking fountain, roof repairs & water shield
-
Teton County
FY24 Amount: $371,135.98
Total Since 1990: $3,118,227.49
FY23 Use: Carpet replacement, flooring maintenance, HVAC maintenance
-
The Village Charter School
FY24 Amount:
Total Since 1990: $254,160.00
FY23 Use: Painting classroom, heat & air repairs, gym floor coating, carpet cleaning, locksmith, fire alarm service
-
Thomas Jefferson Charter School
FY24 Amount:
Total Since 1990: $513,584.28
FY23 Use: Electrical update & new compressor, HVAC repairs & maintenance
-
Three Creek Joint Elementary
FY24 Amount: $838.28
Total Since 1990: $19,529.25
FY23 Use: Heating & cooling system, ongoing repairs & maintenance of building
-
Treasure Valley Classical Academy
FY24 Amount:
Total Since 1990: $151,107.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*
-
Troy
FY24 Amount: $65,144.85
Total Since 1990: $519,941.07
FY23 Use: Salaries & benefits, flooring, maintenance & repairs, installed cameras, gym floor refinished, fire extinguisher service, intercom repair
-
Twin Falls
FY24 Amount: $1,757,171.48
Total Since 1990: $15,986,778.08
FY23 Use: Carpet, misc. projects
-
Upper Carmen Charter School
FY24 Amount:
Total Since 1990: $92,803.49
FY23 Use: Flooring, maintenance, concrete repair
-
Valley
FY24 Amount: $100,405.01
Total Since 1990: $1,278,486.07
FY23 Use: Replacement of HVAC units, roof maintenance, ongoing repairs & maintenance
-
Vallivue
FY24 Amount: $1,923,226.39
Total Since 1990: $13,425,730.20
FY23 Use: HVAC, drinking fountain, plumbing, electrical repairs, fire sprinkler system, HVAC upgrades, flooring repairs/upgrades
-
Victory Charter School
FY24 Amount:
Total Since 1990: $489,920.00
FY23 Use: Normal repair & maintenance, mold removal
-
Vision Charter School
FY24 Amount:
Total Since 1990: $645,118.00
FY23 Use: Salaries & benefits, roof, HVAC, electrical, plumbing, gym floor, general maintenance
-
Wallace
FY24 Amount: $94,794.82
Total Since 1990: $1,198,184.88
FY23 Use: Room maintenance, sliding door replacement, light upgrades, seal replacement, HVAC maintenance & unit replacement
-
Weiser
FY24 Amount: $291,656.54
Total Since 1990: $3,142,504.32
FY23 Use: Painting, carpet in classrooms, boiler/control panel, HVAC units
-
Wendell
FY24 Amount: $220,486.55
Total Since 1990: $2,196,806.28
FY23 Use: Heating & cooling, CTE bldg. upgrades
-
West Ada (Formerly Meridian Joint)
FY24 Amount: $7,421,359.42
Total Since 1990: $63,092,863.47
FY23 Use: Maintenance, painting, roofing, HVAC, plumbing, & general repairs
-
West Bonner County
FY24 Amount: $188,244.20
Total Since 1990: $2,070,485.88
FY23 Use: Routine maintenance, mechanical controls, lighting, filtration, soundproofing, upgrades to signage, security improvements, communication system upgrades
-
West Jefferson
FY24 Amount: $121,718.28
Total Since 1990: $1,362,535.13
FY23 Use: Ongoing maintenance & repair of facilities, plumbing, electrical, flooring, ceilings, & heating repairs
-
West Side Joint
FY24 Amount: $155,146.80
Total Since 1990: $1,340,204.69
FY23 Use: Electrical, HVAC, & other maintenance, maintenance staff salaries & benefits
-
White Pine Charter School
FY24 Amount:
Total Since 1990: $575,651.00
FY23 Use: Carpet, tile, HVAC, plumbing repairs, paint, water bottle fill station, eye faucets replaced, grease trap, fume hood, replaced locks
-
Whitepine Joint
FY24 Amount: $41,268.53
Total Since 1990: $431,365.77
FY23 Use: Custodian salaries & benefits, bldg. maintenance, gym floor refinishing, HVAC repairs, window/siding replacement, gym repairs, electrical repairs & upgrades
-
Whitepine Joint (former)
FY24 Amount:
Total Since 1990: $295,791.02
FY23 Use:
-
Wilder
FY24 Amount: $89,366.95
Total Since 1990: $981,291.31
FY23 Use: HVAC, fire alarms/extinguishers, roof, cleaning, floors, carpet, sinks/urinals, fire radio/alarm system, pest abatement, rekey
-
Wings Middle Charter School (Closed)
FY24 Amount:
Total Since 1990: $45,998.00
FY23 Use:
-
Xavier Charter School
FY24 Amount:
Total Since 1990: $667,372.00
FY23 Use: Replace heat exchange & repair HVAC unit, urinal replacement, repair gas regulator, lighting
-
iSucceed Virtual Charter School
FY24 Amount:
Total Since 1990: $634,806.00
FY23 Use: Not required to report (§ 33-1019, I.C.)*